Configure the 'onsuccess' event
Step 1 :
1.Drag the green dot on the SMS Node to configure the onsuccess event.
Step 2 :
- Choose the onsuccess from the Node event drop-down on the End window.
- Choose select 101 – Successfully completed flow [Success] option from the Custom flow result drop-down. Click on SAVE at the bottom.
Updated 5 months ago